The steel was finished
in July and the crew began pouring our new concrete slab.
This would serve as the future walking surface through
the new store, so we took extra caution to pour as perfect
a slab as possible.
Also new to the project this month was the setting of
the roof trusses and the beginnings of roof system itself.
|