Lots happened in September.
Site work was happening, with underground drains and the
completion of the stormwater pond. The building was almost
fully enclosed
and crews were working hard on HVAC and electrical within
the space. Roofing panels were installed, as well as the
mezzanine space for our offices and lots of interior framing.
|